Supply Scope · 5 min read

Complete system vs. structure only.

The correct route depends on who owns the LED display, mechanical structure, motion control, testing and site integration.

Updated July 21, 2026For LED manufacturers and integrators
Technicians servicing a control panel for a complete kinetic LED system

Choose a complete system when one boundary matters most

A complete system coordinates the LED display, motion structure, control and packing as one supply package. It is the clearest route when the buyer wants fewer interfaces or does not already have a preferred LED manufacturing partner.

For Joeqing’s foldable lifting family, the standard complete route combines the display, folding lift structure, wheeled base and flight case. Standard sizes include 108, 135, 158 and 163 inches, with the 135-inch version positioned as the flagship.

Choose structure or motion only when the display scope is already owned

LED manufacturers and system integrators may want Joeqing to engineer the moving structure and control while they supply the LED modules, cabinets or content system. This can protect an established product line and keep the visible display specification with the buyer.

The interface must still be precise: screen dimensions, total mass, center of gravity, mounting pattern, cable route, service access and tolerances.

Choose a fully customized route when the standard model is close—but not enough

Customization may change size, color, display technology, layer count, motion behavior, brand treatment or installation interface. The quotation becomes project-defined because changes in one area often affect the structure, drive, packing and testing.

Do not compare prices until the supply boundary matches. A structure-only price and a complete-system price are not competing offers; they solve different scopes.

Questions to put in every request

  • Who supplies the LED display or visible surface?
  • Who supplies the servo drives and motion controller?
  • Who integrates media or show-control cues?
  • Who designs the site support and foundation?
  • What will be assembled and tested before shipment?
  • Who commissions the system on site?

Not sure which supply route fits?

Choose “Not sure yet” in the inquiry form and describe what your team already owns.

Compare Supply Routes

Scroll to Top